The task was to unload and install a Buehler aluminium injection moulding machine weighing 46.5 tonnes into a pit. What set this job apart was the fact that the concrete for the machine foundation had only been placed one week before. This meant that the space for setting down our gantry lifting system was very limited.

De keurmerken van Jozef Hermans
Jozef Hermans Industrial Movers